Print

Construction work is well underway on the new Peter May stand at the Kia Oval cricket ground in London. The project, which will see the addition of 1300 seats increasing the ground's capacity to 25,300, is due for completion by May 2016.

As well as the seating capacity, the space beneath the Peter May stand will create a large concourse for the Kia Oval with new bars and catering facilities. The new stand will be capped off with a covered roof terrace and a newly created roof garden.

Kia Oval already has a wide range of conference and banqueting suites, most with natural daylight, pitch views, outside access, air-conditioning and complimentary wi-fi. 40 executive boxes are available for small meetings and training events. 650 delegates can be accommodated for larger events and banqueting.

Kia Oval is within easy walking distance of Oval and Vauxhall tube stations in London.

Details: www.events.kiaoval.com

Published: 05 January 2016
Hits: 917